construction.

August 11, 2020

BuildLog – TBL – 8/10/2020

t was a long weekend of work on the Tuscarora Branch Line. After building the layout last week and staining the frame (over the weekend), I got track mounted on it, carefully including my feeder sections. A lot of effort here to get the track flat and make sure the turnouts still worked (my first go, I dislodged one of the wires). So tonight Steve Raiford and I soldered the feeders to a single terminal strip, in preparation for connecting up the booster. We were about done when a routine currency check noted that he had a short somewhere. Steve […]