ntrak

December 19, 2019

OpsLog – L&MO – 12/18/2019

ast run of the year, doing it early on the club layout. And man, what a start. Bitch mode on First, we (meaning the club – I didn’t sign up) have a show this weekend. But I got pulled into the load effort which ran two hours late (with would explain the Silver Bullets in ops). So instead of dinner, I gotta beeline to the club to load modules. And when we open the trailer door, there is a big hole cut into the floor (evidently some people started doing repairs, got bored halfway through and wandered off). So it […]
January 23, 2020

OpsLog – LM&O – 1/22/2020

rduous is a brainy word I had to look up for spelling since i don’t use it often. Used in an example: our ops session was arduous. I took the Mingo Turn out first thing at midnight. Fortunately is was still an interchange-only run so outside of a shuffle or two, I had it done pretty quick (and I got to watch a cornfield meet right outside of my cab window). But I had a bad feeling as time passed and I finished my work – Zanesville is further up the line and the turn servicing it had not been […]