line

October 18, 2020

OpsLog – 10/17/2020

nother op session at the club today, with AJ running his coal and Ben as the switch crew. In the logistics side, Greg ran the DS panel and I worked the nonlocking interlocking. And, as Greg put it, I also worked as the superintendent (and an auxiliary brakeman). First off, this little beauty was in place, my very first structure, the Tuscarora Station. You’ll notice that it’s been out of service for twenty years, that the paint is cracked and peeling. Not added yet are the boards over the windows and doors (or the roof weathering). And station signs. So […]
March 14, 2021

OpsLog – TBL – 3/13/2021

f course, if half of your crew is new and you are superintendent to a railroad with intense switching and interlocking control, what do you do? You go easy and drop the freight levels to the lowest possible settings, right? No, I cranked them all the way up. The pre-session extra freight dropped two cars on the siding (doubling the work of Tuscarora Local 1) and two coal trains had drops (one load, one empty). Brian (as the switcher) and his son Tyler (as the towerman) had their hands literally full for the session. And I’m happy to say they […]
July 18, 2021

OpsLog – TBL – 07/17/2021

nother busy day on the Tuscarora. I thought we were going to have four people but because of sweeping Covid fears, the father/son team I invited had to cancel. And that left me with 50% crew. In a normal ops session, a disaster. But the modular functionality Tuscarora Branch Line can run as easily with one as it can with four. So with Greg (my long-time engineer who has been with this project from the start) we set all signals to green, coupled in the mini-tower (which lets an operator easily run the layout) and began. He ran the local […]