Train Blog

May 28, 2016

OpsLog – FEC – 5/28/2016

ust another day on the railroad. Ran the 940 rock run under great difficulty – a car on the team track, my trick siding packed to full, and a boxcar coming in and out. Yeah, it was a stumblefest. I wasn’t sure if I’d ever get it worked. But the weather held off and soon I was ready to highball out – I just had to let about three trains, a railcar, and two trudging hobos get past before the DS would let me out. So that’s why I was an hour late. That’s usually the most tricky turn on […]
June 11, 2016

OpsLog – WBRR – 6/11/2016

ooks and movies never work well if nothing goes wrong. The excitement comes from complications and deviations from the plan. Like in the  movie Alien. Would you really want to watch it if, after the facehugger thing got that guy, they locked him down in proper medical observation, saw the seed, removed it, squashed it? Then you’d have ninety minutes of them getting themselves ready for cold sleep, just SOP, nothing more. Well, in model railroad operations, running the timetable is the goal. Immediately after our last session in March, Al, Phil and myself took Al’s original written instructions for […]
June 22, 2016

OpsLog – LM&O – 6/22/2016

ummertime, and the ops are uneasy… Yeah, summers – we always have a dip in attendees. Our roster drops off. Worse, some of our good operators are off to college soon, so we’re screwed in the near future. It was pretty light tonight – had all the opening train warrant moves figured. Then I got one of the weirder calls from the Mingo Turn, just out of Martin Yard, crossing over to track two to work the quarry. “Snakes on your train?” I had to ask, not sure what I heard from him. “No, snakes in my house. Wife called. […]
June 25, 2016

OpsLog – FEC – 6/25/2016

nother big day over at the FEC. I wasn’t sure what I wanted to do, and in retrospect, I got some pretty sweet jobs – just easy run throughs with a minimum of switching. And that’s fine – sometimes I like the air-traffic-control nature of dispatching, sometimes I like the stress-puzzle of industrial switching, but sometimes I just want to run trains, blow the whistle correctly at crossings, ring the bell while passing stations and yards, just doing everything by the book. Funny, but my buddy Bob got all the jobs I had last time, the tough limestone trick, the […]
July 27, 2016

OpsLog – LM&O – 7/27/2016

as shaping up to be a good night. Came in and the lot was filling in front of the clubhouse. Everyone cleaned. We had all sorts of improvements ready to try. A bunch of new people upshifted their jobs to more difficult ones. The crewcall sheet filled up. I set up in the office, got everything running, and we were off. A good flow. The Harris Glen summit was packed and along the river route, a general freight, a passenger train and a coal drag chased each other along the winding route. The newbies picked up the warrants pretty well […]
July 30, 2016

OpsLog – FEC – 7/30/2016

itting in Palm Bay on a hot Florida day, up in the cab of 208 (a through freight with a sprinkling of setouts), looking at a red board. Not going anywhere. Turns out a train up the line in Melbourne has tripped the new automatic detector, identifying something dragging, hanging, or on fire. So his conductor is out walking the train. And for the thirty minutes that takes, we’re waiting for the line to clear. Finally, finally, finally I see blue boxy engines pushing through the heat simmer, running south towards me. I nod to the crew of the delayed […]
August 24, 2016

OpsLog – LM&O – 8/24/2016

razy night at the club house. First, after all the work we did on electrical things over the last month, another failure, this time caused (we think) by a bad toggle or turnout motor in Martin Yard. So, rain delay until Fearless Frank and Big Bob could root around in the catacombs and bypass it. If we had to lose a turnout out of the dozen in the throat, this was the best. So, lucky break for us. I ended up on the dispatcher panel again. The night was fun but weird – trains weren’t sequencing like I usually see. […]
August 27, 2016

OpsLog – FEC – 8/27/2016

e all can’t have good days. Well, I had a great day. First, I tugged out a cut of rock cars out of City Point. Ran them down to Frontenac, ran around the train then cruised the layout on greens, a neat run. Also got to brief a first-timer in the Eau Gallie shuffle, explaining the trick of it. And he did just fine. Smiles all around. But then I was on the Buenaventura Turn, a clean run down without any interruptions. Since I’ve done this job before I had no problem sorting out the cuts and putting everything where […]
September 18, 2016

OpsLog – FEC – 9/27/2016

I guess it’s about pattern recognition. When you first sit down in front of Ken Farnham’s FEC control panel, you are struck with the idea of just what sort of idiot you were for taking on this job. I always feel this way. After all, the panel wraps around you, something like four or five feet across, with a bewildering number of toggles and lights and this long, long layout. And once that clock goes hot, everyone wants to move, there are trains marked with secretive red lights (with no obvious indication of who they are) idling impatiently, all wanting […]
September 28, 2016

OpsLog – LM&O – 9/28/2016

ou know it’s going to be a bad ops night at the club when you get into the lot and there is one car sitting there, all by itself. You really know it is when that one person tells you that Calypso Yard is dead. No power. No trains can move. Yikes. Calypso is a collective yard on the eastern approaches to our steep mountain district. Cars from several different lines are gathered here, to be tacked onto westbounders boosted through the high pass. And descending trains do the opposite, dropping cuts to be parceled out to other roads. We […]